Pass schedule — 2026-10-06
| AOS | Satellite | Band | Az | Max El | Dur | RX | C/N | GB | Status |
|---|---|---|---|---|---|---|---|---|---|
| Σ 19 passes | |||||||||
Drill: Numeric display: a dashboard with 6 metrics. Mono numerals, tabular-nums, right-aligned, consistent decimal places. Target: numbers scannable like a spreadsheet.
Interpretation: Building a satellite ground-station pass-operations console (Downrange Network) — 6 mixed-scope KPIs over a 19-row pass schedule. New stresses: negative-significant receive levels (−101.3 dBm) with reserved sign slots, exponent-format packet-error rate, count denominators (9/12), and per-unit decimal contracts. Inter + JetBrains Mono (tnum/zero/liga-off) on cool #f7f8f9 paper, single teal accent on live/interactive only, every displayed magnitude derived from the dataset in JS.
| AOS | Satellite | Band | Az | Max El | Dur | RX | C/N | GB | Status |
|---|---|---|---|---|---|---|---|---|---|
| Σ 19 passes | |||||||||